Skip to content
CoreBuild
(941) 941-9576 Request a Quote

Bathroom remodeling

Bathroom Remodeling

Bathroom remodels with custom vanities, tile, fixtures, lighting, and storage planned together, and the licensed plumbing and electrical coordinated for you. Serving Bradenton, Sarasota, and the Gulf Coast.

3to 5 wk

Typical full bathroom

2

Vanity heights offered (standard and comfort)

1

Point of contact

Small room, many decisions

A bathroom has more finish decisions per square foot than any room in the house: tile, grout, fixtures, vanity, countertop, mirror, lighting, hardware, paint. Choosing them one at a time is how bathrooms end up looking assembled rather than designed.

We plan them together. The vanity is sized to the wall. The tile layout is set to the fixture locations. The lighting is planned for the mirror. Each choice is checked against the others before anything is ordered.

Vanities built for the wall

Most bathroom storage problems come from stock vanities that leave gaps and hide everything behind one door. A custom vanity uses the full width, adds drawers, and can be built at comfort height. We match it to the tile and hardware so the room reads as one piece.

Coordinated with licensed trades

Moving a drain, adding a shower valve, or relocating an outlet is regulated work. We plan it during design and coordinate it with licensed and insured professionals, so the schedule holds and the inspection passes.

Start with a photo

Send us the bathroom as it is, plus a photo or rendering of what you want. We measure, tell you what fits, select real samples, and organize the cost before work begins.

How it works

Idea, plan, build

Every CoreBuild project runs the same three steps. The plan is where the budget and the schedule get decided.

  1. Consultation & Measurements 01

    Consultation & Measurements

    We talk through what you want, walk the space, and take the measurements everything else is built on.

  2. Concept & Planning 02

    Concept & Planning

    Your image, sketch, or idea becomes a layout and a material direction that fits the real room.

  3. Estimate & Schedule 03

    Estimate & Schedule

    A cost structure by category and a schedule you approve before anything is ordered or built.

  4. Production & Preparation 04

    Production & Preparation

    Cabinetry is fabricated, materials are ordered, and licensed trades are scheduled and coordinated.

  5. Installation & Execution 05

    Installation & Execution

    We install, build, and finish on site, in the order that keeps your home usable.

  6. Final Details 06

    Final Details

    Hardware, trim, touch-ups, cleanup, and a walkthrough with you before we call it done.

Questions

Bathroom Remodeling: FAQ

How long is the bathroom out of service?

For a full remodel, plan on the bathroom being unusable for most of the schedule, typically three to five weeks. For a vanity and finish refresh, it is often a week or less.

Do you build custom vanities?

Yes. A custom vanity fits the wall exactly, hides the plumbing cleanly, and puts drawers where a stock vanity has a door. It is one of the highest-impact upgrades in a bathroom.

Can you convert a tub to a walk-in shower?

Yes. That involves licensed plumbing and often waterproofing details, which we plan and coordinate with the right professionals.

Which tile and fixture brands do you use?

We source through trusted suppliers and show you real samples. We are not tied to one brand, so the selection follows your budget and the look you want.

Ready to start?

Send us your bathroom remodel idea. We will tell you what it takes to build it.

An AI image, a photo, a sketch, or just a room that is not working. We reply with next steps, not a sales pitch.